Management of brewery dismantling work with Paulaner as an example
Paulaner is currently building a completely new, state-of-the-art brewery in Munich-Langwied. The existing equipment at the site in Munich-Au is slated to be sold. Since the brewery at the new location is gradually being commissioned, the equipment at the Munich-Au site is slowly being decommissioned, and for a time, production will occur at both locations. This presents quite a challenge, but it is one that can be overcome by creating a timetable and a sequential plan for optimizing the removal of the equipment.