Accessibility Tools

22 October 2001

Focus on new plants: Ringnes, Gjelleråsen/Norway: It’s achieved! Move, installation, commissioning and inspection of filter lines

The move of a filter line of 300 hl/h from the centre of Oslo to the suburb of Gjelleråsen as well as the integration of a new "Primus Filter Line" with a capacity of 400 hl/h will be described in the following article.

The Pripps Ringnes Group, the leading beverage entrepreneur in Northern Europe has built a new beverage production plant in the outskirts of Oslo. The project was divided into two stages. Stage 1: production and filling of soft drinks and mineral water, which was already completed. Stage 2: production and filling of beer had to be completed.
In June 2000 SeitzSchenk Filtersystems received the order to integrate a new PRIMUS filter line of 400 hl/h as well as to remove one of the two existing ZHF filter lines of 300 hl/h.
....

Current issue

BRAUWELT International

Receive the most important BRAUWELT news three times a month for free.
Newsletter archive and informations
Your data is secure and will not be passed on to third parties. You can revoke your consent at any time by clicking on the unsubscribe link at the end of the newsletter.

By clicking on "Subscribe to newsletter," you confirm that you have read our privacy policy and accept the processing of your data as described therein.

Current issue

BRAUWELT International

Receive the most important BRAUWELT news three times a month for free.
Newsletter archive and informations
Your data is secure and will not be passed on to third parties. You can revoke your consent at any time by clicking on the unsubscribe link at the end of the newsletter.

By clicking on "Subscribe to newsletter," you confirm that you have read our privacy policy and accept the processing of your data as described therein.

BRAUWELT on tour

Craft Brewers Conference & BrewExpo America
Date 20 Apr 2026 - 22 Apr 2026
kalender-icon