Accessibility Tools

13 April 2016

Biogas production from brewery yeast in an EGSB reactor

Experience over a five-year period of full throughput using anaerobic co-digestion of brewery yeast for biogas production is described in this contribution. The brewery, with a total amount of available yeast (0.7 v/v %), had a 26.2 % increase in COD load and a 38.5 % increase in biogas production resulting in an increase in the biomethane/natural gas substitution ratio in the brewery from 10 % to 16 %.

Current issue

Brauwelt International Newsletter

Newsletter archive and information

Mandatory field

Current issue

Brauwelt International Newsletter

Newsletter archive and information

Mandatory field

BRAUWELT on tour

BrauBeviale
Date 26 Nov 2024 - 28 Nov 2024
Trends in Brewing
06 Apr 2025 - 09 Apr 2025
kalender-icon