Accessibility Tools

22 October 2001

Focus on new plants: Ringnes, Gjelleråsen/Norway: It’s achieved! Move, installation, commissioning and inspection of filter lines

The move of a filter line of 300 hl/h from the centre of Oslo to the suburb of Gjelleråsen as well as the integration of a new "Primus Filter Line" with a capacity of 400 hl/h will be described in the following article.

The Pripps Ringnes Group, the leading beverage entrepreneur in Northern Europe has built a new beverage production plant in the outskirts of Oslo. The project was divided into two stages. Stage 1: production and filling of soft drinks and mineral water, which was already completed. Stage 2: production and filling of beer had to be completed.
In June 2000 SeitzSchenk Filtersystems received the order to integrate a new PRIMUS filter line of 400 hl/h as well as to remove one of the two existing ZHF filter lines of 300 hl/h.
....

Current issue

Brauwelt International Newsletter

Newsletter archive and information

Mandatory field

Current issue

Brauwelt International Newsletter

Newsletter archive and information

Mandatory field

BRAUWELT on tour

BrauBeviale
Date 26 Nov 2024 - 28 Nov 2024
Trends in Brewing
06 Apr 2025 - 09 Apr 2025
kalender-icon