Effluent pre-treatment plant at Wieninger Private Brewery in Teisendorf/Germany
After a construction period of almost one year, M. C. Wieninger Brewery in Teisendorf has commissioned an anaerobic waste water pre-treatment plant in September. Rising effluent costs, an anticipated financial contribution to the extension of the municipal treatment plant and, last but not least, environmental considerations which are accorded high priority at Wieninger led to a decision to build an in-house treatment plant. Biotim of Karlsruhe were responsible for the overall design and erection of the plant on a turn-key basis.